Finishing up on the Greenhouse

Well, I have made great progress on the greenhouse, it has been painted up, the roof and window panels are installed, along with a ridge vent.  I have two windows that open for more air flow during those "hot" times, with screening to keep the bugs at bay...it was a chore, but well worth the effort. Here are some pics....







 I still have to place the storm door which was graciously donated by my neighbor "Skip" whom I wish to thank. After which I will be placing the substrate for the flooring which will consist of sand/gravel and paver stones, and due to the excessive heat buildup I will be placing a gable mounted solar powered attic fan in one end of the building with possibly a "Swamp cooler" in the other once I run the electric and water to the building....more to come.

Related Posts by Categories

0 komentar:

Posting Komentar

Blog Archive

Diberdayakan oleh Blogger.